Contracting & Technical Support for Hotels & Residences, by Fanik Design

Contracting is where the design becomes reality — and where it's decided whether the project will be delivered as drawn. Fanik Design executes construction works with our own, proven crews: from structural and building works and electromechanical installations to the final finishes that give a space its character.

Execution with the precision of the design

Our strength is combining the aesthetics of a design studio with the solid execution of an experienced contractor: because we design, we know how to read a study — and because we build, we know what every line of it means on site. Before each project you receive detailed quantity surveys and pre-agreed costs; during it, daily presence and coordination; at the end, a space that matches the drawings you approved.

What we undertake

  • Building works: masonry, plastering, flooring, insulation — the backbone of every project.
  • Electromechanical installations: electrical, plumbing, heating and cooling, by certified technicians.
  • Final finishes: windows and doors, joinery, painting, bespoke constructions — the details that show.
  • Working with external designers: we execute studies by other architects, fully respecting their design.

We can take on the entire project or specific phases — only the building works, or only the finishes. If you want coordination without our execution, see Construction Management; if you want everything from one hand, our Turnkey service.

Frequently Asked Questions - FAQ : What you need to know about Contracting.

1. How is the cost secured before the project starts?

Through detailed quantity surveys and pre-agreed costs per work item before anything begins. You know what you're paying for and what you'll receive — and any change is priced and approved by you before it's executed.

2. Do you execute designs by other architects?

Yes. We work seamlessly with external designers, fully respecting their design — our job is to build it faithfully and to a high standard.

3. Can you take on only part of the project?

Yes — specific phases, such as only the building works or only the final finishes. We'll tell you honestly whether partial assignment suits your project or creates accountability gaps.

4. How is the timeline kept?

Through early material ordering, correct crew sequencing and contingency plans for when something unexpected happens — because on construction sites, something always does. The difference is how quickly it's absorbed.

5. Who supervises your works?

We supervise daily with our own site manager, solve technical issues on the spot and coordinate the workflow. We guarantee faithful execution of the design and correct operation of all installations.